An old renovation, unfinished paperwork or DIY work you are unsure about can raise questions when it is time to sell. Here is how we help establish what happened and what needs to happen next.

CodeCompliance4 min read

Finding out that building work was never signed off is an unwelcome discovery when you're getting ready to sell. You may already be talking to an agent and making plans for your next home when a question about an old renovation sends you looking through paperwork you haven't touched in years.

Perhaps you paid a builder to do the work and assumed the final council steps had been taken care of. Perhaps the changes were there when you bought the property. Or perhaps you did some work yourself and are now wondering whether it needed consent. Before deciding how to deal with it, we need to understand what happened and what records exist.

Imagine, for example, that you're preparing to sell a home where the bathroom and part of the internal layout were altered several years ago. You have a few invoices and some photos, but you can't find a final certificate. You remember tradespeople being involved, although you're not sure which changes were included in the consent. This is an illustrative situation, but it shows why we would start with the property's history before preparing an application.

We can obtain the council property records and go through them alongside anything you already have. We're looking to establish when the work was done, who was involved, what was approved and which inspections took place. We also want to see whether council asked for information that was never supplied, or whether a certificate already exists that simply isn't in your own files. Where the records and the property appear to differ, we can coordinate the professional advice needed to understand that difference.

What we find determines the next step. Where work had a building consent but the final sign-off is outstanding, we would investigate what is needed to progress a Code Compliance Certificate, usually called a CCC. This confirms that council is satisfied the work complies with the building consent. An unfinished consent needs to be understood on its own terms, including any outstanding documentation or inspection requirements.

If work was carried out without a required consent, a Certificate of Acceptance, or COA, may be an option for work done after 1 July 1992. It has its own requirements and isn't an automatic substitute for a CCC. Council needs enough evidence to assess the work, and the certificate may cover only the parts it can verify. There are also situations where work was exempt from building consent, provided the relevant conditions were met. Exempt work still has to meet applicable Building Code requirements, so the fact that something was DIY doesn't settle the question either way.

Once we have a clearer picture, we can speak with council and the relevant professionals about the appropriate way forward. In the bathroom example, we might approach the original tradespeople for records they hold, then coordinate any further assessment needed. Depending on the changes, a builder, designer, engineer or specialist trade may need to contribute. We organise those conversations around what the property actually needs.

The evidence matters as much as the application itself. Plans and inspection records can tell part of the story, while photographs from construction, trade documentation and professional reports may help fill in the gaps. Where work is hidden behind a finished wall or beneath a floor, establishing what was done can be more difficult. We help coordinate the questions and information, while the appropriate professionals assess the work and council decides whether the evidence is sufficient.

Sometimes that process identifies building work that needs to be put right. We can recommend builders we work with, and help clarify the council documentation and inspection requirements before remedial work starts. We don't manage the building work itself. That is arranged and managed separately, while we continue to look after the documentation and council liaison around it.

When the required information is ready, we can prepare and submit the appropriate application on your behalf. We then handle the council correspondence, coordinate responses from the people involved and arrange inspections as needed. If council asks for something further, we keep track of that request and help get it to the right person, so you're kept informed about what is still outstanding.

The outcome rests with council, and submitting an application doesn't guarantee that a certificate will be issued. It also helps to be realistic about timing, particularly if you already have a sale date in mind. Tell us about that early so we can take it into account, but allow for the possibility that gathering evidence, completing work or answering council questions will take time.

You don't need to solve all of this before contacting us. Your property address, a rough description of the work and any correspondence you have are enough to start a conversation. If you have plans, invoices or photographs, we can work through those with you too.

We help property owners across the wider Auckland region make sense of outstanding council documentation and work through the next steps. If something has come up while you're preparing to sell, complete our enquiry form and tell us what you've found. We can help establish where things stand and what needs to happen from here.